139 Brophy's Lane (formerly Havens)

Notice of Water Shut-Off
October 2, 2025 (9:00 a.m. - 5:00 p.m.) 

Please be advised that Hebster Construction Inc., on behalf of the Developer, L&W Properties Ltd., will be working on water services and watermains in the project area, which will require the water supply to be shut off to a portion of Brophy's Lane on October 2, 2025, from 9:00 a.m. until 5:00 p.m. For more information, including a map of the water shut-off area, please refer to the Water Shut-Off Notice. 

View Water Shut-Off Notice (October 2, 2025)

Notice of Water Shut-Off
October 8, 2025 (9:00 a.m. - 5:00 p.m.) 

Please be advised that Hebster Construction Inc., on behalf of the Developer, L&W Properties Ltd., will be working on water services and watermains in the project area, which will require the water supply to be shut off to a portion of Brophy's Lane on October 8, 2025, from 9:00 a.m. until 5:00 p.m. For more information, including a map of the water shut-off area, please refer to the Water Shut-Off Notice. 

View Water Shut-Off Notice (October 8, 2025)

Notice of Development Activity
September 23, 2025 - October 31, 2025

Please be advised that development activities related to 139 Brophy's Lane will begin on September 23, 2025, and are expected to be completed by October 31, 2025.

Brophy's Lane, from Highway 26 to 143 Brophy's Lane, will be closed from September 23, 2025, until October 9, 2025 (est.) to facilitate the installation of infrastructure. 

View Notice of Development Activity          What to Expect

Project Information
Application Type(s)
Subdivision
Town file #
P223
County file #
42T-2018-14
Address
Part Lot 21, Concession 1
Total Residential Units
16
Project location
Craigleith

Follow This Project

Subscribe now to receive timely updates regarding this project direct to your inbox.

Subscribe

This is an application for a Plan of Subdivision, Plan of Common Element Condominium in November 2009. The purpose of the applications was to consider a proposed 18 lot Plan of Subdivision. The Plan of Subdivision proposes to create the 19 individual lots, plus blocks consisting of existing wetlands, hazard lands and a stormwater management pond. The Common Element Condominium proposes condominium ownership of the internal road and the wetland/hazard/stormwater blocks. 

The subject lands are located at Part Lot 21, Concession 1 and are bounded on two sides by Brophy’s Lane. The lands are approximately 3.48 hectares in size, are mostly tree-covered and also include a Provincially Significant Wetland. Surrounding land uses include existing single detached residential uses to the north and scattered single detached residential uses and future development lands including the proposed Aquavil (formerly Terrasan) Project to the south and to the east. The shores of Nottawasaga Bay are located approximately 200 metres north of the property. To the east is the Craigleith Wastewater Treatment Plant.  Municipal water is available along both frontages of Brophy’s Lane. Municipal sewers do not front the property and are proposed to be extended from the east to service the 18 lots.

This development did receive Draft Plan Approval, subject to conditions, from the then Ontario Municipal Board (OMB) in 2012. Presently the current Owner has made an application to advance this project from the Draft Approval stage to the Registered Plan stage. A copy of the Owner's submission documents can be found below. 


Development Activity: What to Expect

The Town of The Blue Mountains would like to inform those interested in the 139 Brophy’s Lane project that a Subdivision and Condominium Agreement has been executed, and Development Engineering activities will begin September 23, 2025. 


Related Documents

Development Timeline

 This icon indicates when the Public Meeting will take place.

 Click or hover over each step for more information.

Visit Explore the Development Process for a more in depth look at each phase.

Pre-Consultation:

  1. completed
  2. completed

Planning:

  1. completed
  2. completed
  3. completed

Development Engineering:Pre-Servicing Agreement in Effect

  1. completed
  2. completed
  3. current step
  4. not completed
  5. not completed

Building:

  1. not completed
  2. not completed
  3. not completed
  4. not completed