Landfill Twin Scale and Scale House Upgrades

On this page: 
1. Project Updates
2. Site Plan

This project will refurbish a 20 year old vehicle scale and add a second scale on the opposite side of the existing scale house. This will provide improved traffic management and reduce wait times for patrons entering and leaving the site. 

The scale house will receive upgrades to the building envelope, windows and doors, HVAC and septic system reconfiguration. Improvements will also add renewables to the scale house to improve climate mitigation and resilience. Improved insulation and the installation of more efficient heating and cooling will reduce energy use and make the building more comfortable for occupants. The project will also collaborate with Pollinate TBM to include pollinator landscaping between the twin scales and around the house.

  • September 2025 - Install new load cells and electronics for existing scale (Complete)
  • January 2026 - MECP approval of amendment to ECA (Complete)
  • May to July 2026 - Reconfigure septic system and install communications conduit (Complete)
  • September 2026 - Install secondary scale
  • October 2026 - Improvements to scale house building
  • Spring 2027 - Refurbish existing scale deck, install signage and landscaping

Why Now?

Landfill use has increased to more than 30,000 visits per year and generated longer wait times. The second scale will provide improved traffic flow with separate entrance and exit scales. Retrofitting the existing building will avoid the cost of full replacement and improve the useful life of this existing Town asset. Increasing and improving access to the Depot will support diversion efforts. Approximately 48% of waste delivered to the Depot was diverted from landfill in 2025.


Project Updates


Site Plan

Site plan showing location of new scale in relation to scale house