Image
Aerial photo of Northwinds Beach looking back towards the Escarpment

East Side Water Storage Environmental Assessment

On this page:
1. Project Updates
2. Public Consultation
3. Related Documents

The Town is completing this Class Environmental Assessment to evaluate and select the preferred solution to address the Town’s water storage and water supply in the general area east of Wards Road to Grey Road 21. This includes Pressure Zones 1 East, 4 (a, b, c, d) and 5.  

Storage

At build-out, approximately 8,300 m3 of storage is required in Zone 4. There is currently 5,000 m3 of built storage that serves that pressure zone, leaving a deficit of at least 3,300 m3.

Supply

In the 20-year horizon build-out scenario, the projected supply is not adequate. Historically, the Town’s water system has been set up to transfer water from pressure zones in the west, to pressure zones in the east through the Arrowhead Booster Pumping Station. The current water system is long and lacks looping and redundancy. It is reliant on the Thornbury Water Treatment Plant and a supply from the Town of Collingwood via the Mountain Road Booster Pumping Station.

Preliminary Preferred Alternative

The preliminary preferred alternative identified through the study includes the following:

  • Construct new water treatment plant in Craigleith with 7,133 m3/day capacity
  • Upgrade Thornbury Water Treatment Plant capacity to 18,165 m3/day
  • Construct new 5,000 m3 at-grade reservoir in Craigleith
  • Construct new 285 L/s booster pumping station in Craigleith and decommission existing Arrowhead Road Booster Pumping Station
  • Twin watermain from new water treatment plant and reservoir to Happy Valley Reservoir
  • Twin watermain from Happy Valley Reservoir to east limits of pressure zone 4

This alternative has been endorsed in principle by Town Council. Members of the public are invited to share their comments and thoughts with the project team by emailing icpc@thebluemountains.ca

View Draft Project File Report 

View Appendices

Why Now?

To evaluate solutions to the Town's storage and supply deficiencies in the East Pressure Zones.


Project Updates

June 17, 2026 - Public Information Centre Summary

The presentation deck and recording of the Public Information Centre held on June 16, 2026 regarding proposed upgrades to the Thornbury Water Treatment Plant are now available to view in the Public Meetings & Information Centres section below.


Public Consultation

Thornbury Water Treatment Plant EA Public Information Centre - June 16, 2026

This Public Information Centre is being held to review the scope and potential impacts of the identified proposed upgrades to the Thornbury Water Treatment Plant.

View Presentation Deck

View Meeting Recording

View Notice


Related Documents