

Staff Report PBS.26.049 is scheduled to be presented at the Committee of the Whole meeting on June 9, 2026. The information report provides Council with an overview of three related projects within the Grey Road 19/Craigleith area, including the MacPherson Home Farm purpose-built rental housing proposal, the peopleCare long-term care home proposal, and the Town’s proposed Firehall #2 Telecommunications Tower. The report summarizes how the projects have come together, their individual intent and vision, coordinated infrastructure and land use relationships, and each project’s current status within the approval process.
A Public Meeting regarding this project has been scheduled for Tuesday, June 23, 2026, at 9:30 a.m. in a hybrid format (in-person AND virtual/online).
Subscribe now to receive timely updates regarding this project direct to your inbox.
SubscribeThe Town of The Blue Mountains is proposing a new 24.38 metre (80 foot) 90 metre tall 2.13m x 2.13m triangular lattice style tower. The tower will be free-standing to provide point-to-point connectivity for two-way base-station radio connections for Fire Department communications and will also provide point-to-point connectivity to the Craigleith Wastewater Treatment Plant, Happy Valley Reservoir, and the existing (to be replaced) Fire Hall #2. Enhanced metering infrastructure related to remote water meter readings is also proposed.
The geographic coordinates for the proposed site are as follows: N 44o 30’ 57.8’’ W 80o 19’ 19.9’’
The establishment of new telecommunication facilities is under the exclusive jurisdiction of the Federal Government. Innovation, Science and Economic Development (ISED) Canada is the approval authority for telecommunication towers and requires all proponents of new facilities to consult local planning authorities to ensure local protocols and surroundings are considered during the mandated site selection process. The Town of The Blue Mountains Protocol for Establishing Telecommunication Facilities requires public consultation for all new telecommunication facilities.
A Public Meeting regarding this project has been scheduled for Tuesday, June 23, 2026, at 9:30 a.m. in a hybrid format (in-person AND virtual/online).
Visit Explore the Development Process for a more in depth look at each phase.